Belrose Collection: Premium Townhouse Stone Adhesive Case Study
Share
Case 07 | THE BELROSE COLLECTION
Townhouse · 28 Lockwood Ave, Belrose NSW
|
Location |
28 Lockwood Ave, Belrose NSW |
|
Scale |
13 townhouse dwellings |
|
Product Used |
LEVELMAX ProBond C2TE S1 Tile Adhesive |

Project Overview
The Belrose Collection is a boutique townhouse development on Sydney's Northern Beaches, comprising 13 premium dwellings. The project integrates modern materials with a natural bush setting, with extensive use of natural stone across interior and exterior surfaces.

Product Application
• Natural stone bonding: The Belrose Collection specifies significant areas of natural stone across bathrooms, kitchens, and outdoor terraces. ProBond's high tensile adhesion strength of ≥1.5 MPa ensures stone panels remain securely bonded long-term, satisfying ISO 13007 C2 classification requirements for heavy stone applications.
• Water-immersion durability: Bathroom and outdoor terrace stone areas are subject to sustained wet conditions. ProBond retains ≥1.2 MPa tensile adhesion after water immersion, ensuring the tile-adhesive bond remains structurally sound in permanently damp environments.
• Freeze-thaw resistance: Northern Beaches locations experience meaningful overnight temperature variation. ProBond maintains ≥1.2 MPa adhesion strength after freeze-thaw cycle testing, making it suitable for exposed outdoor stone paving and cladding applications.
• S1 deformability classification: ProBond's S1 deformability rating accommodates minor substrate movement and thermal expansion — critical for outdoor stone installations subject to seasonal temperature movement.
Related products and project support
Explore the products referenced in this case study and review current documents before planning your project.
More project case studies
- The Maitland Square, Norwest NSW — ProBond
- Summer Hill Public School, Summer Hill NSW — ProBond
- Chapman Gardens, Sydney NSW — ProBond
Prev post
Summer Hill Public School Tile Adhesive Case Study
Updated on 24 April 2026
Next post
Infinity Park 300+ Unit Subfloor Case Study
Updated on 24 April 2026