LUXTON Carlingford: 104-Unit Residential Flooring Case Study

LUXTON Carlingford: 104-Unit Residential Flooring Case Study

 Case 01  |  LUXTON

  Apartment  ·  12 Shirtey St, Carlingford NSW

Location

12 Shirtey St, Carlingford NSW

Scale

104 apartment units

Product Used

LEVELMAX ProFlow Self-Levelling Compound

Project Overview

LUXTON is a modern high-rise residential development in Carlingford, targeting the mid-to-premium apartment market with 104 units across multiple levels.

Product Application

ProFlow was selected for full-floor subfloor preparation throughout the building. Key advantages in this application included:

• Multi-level, large-area efficiency: ProFlow's 1–40 mm single-coat thickness range accommodated varying floor level deviations across different storeys without the need for multiple passes.

• Installation programme: ProFlow can accept light foot traffic after about 3 hours under normal conditions. Floor coverings can be installed from 24 hours, subject to application thickness, substrate moisture, temperature and humidity. Confirm the current TDS and the flooring and adhesive requirements before scheduling subsequent installation.

• Underfloor heating compatibility: Selected apartment units featured in-slab heating systems; ProFlow's low-shrinkage formulation performs reliably through thermal cycling without cracking.

• Low-dust formula: Reduced airborne particulate during mixing and application, maintaining a cleaner working environment in enclosed residential floors.

Application Notes

All concrete substrates were mechanically prepared to CSP #3 and primed with LEVELMAX Primer X Concentrate prior to levelling. ProFlow was mixed at 4.8 L of clean water per 20 kg bag and applied within its 20–30 minute working window using an approved on-site mixing pump for continuous large-batch production.

Share This